Resources
Verification procedure
Standard operating procedure · issue 3 · 1996
1. Scope
This procedure governs the reconciliation of a physical count against a produced image set, for all filming and scanning work.
2. The count
The bench counts the items physically and records the figure on a tally sheet. The tally is initialled. A count made by the operator who produced the images is not a count and may not be used.
3. The check value
The check value CRC-A is defined as:
CRC-A = (page count × 7) modulo 97
expressed as <batch>-<NN>, two digits, leading zero retained. CRC-A is computed over the image set, not over the manifest. A manifest is a statement of intent; the image set is the work.
4. Reconciliation
Where the check value computed over the image set does not equal the declared value, the batch is held and the discrepancy is reported to the Managing Director in writing on the same day. No batch may be certified while held.
5. Retention
Tally sheets are retained for the life of the contract plus six years.